East Kilimanjaro Water Supply Project – EKTM I and EKTM III – Tanzania
Construction of:-

  1. Rehabilitation of 3 intakes.
  2. Replacement of 18 air valves and 19 washouts.
  3. Installation of 8 bulk meters.
  4. Rehabilitation of collection chambers and break pressure tanks.
  5. Replacement of 1500m of DN 250 transmission main with DN 300 DCI pipes
  6. Replacement of 2150m of DN 200 transmission main with DN 250 DCI pipes
  7. Replacement of 1650m of DN 150 transmission main with DN 200 DCI pipes
  8. Rehabilitation of the Amboni Reservoir (4600M3)
  9. Supply and installation of 2,204m  DN200 uPVC pipes
  10. Supply and installation of 2,898m  DN150, uPVC Pipes
  11. Supply and installation of 1,494m  DN200 DI pipes
  12. Supply and installation of 4,502m  DN150 DI pipes
  13. Supply and installation of 2,207m  DN100 DI pipes
  14. Rehabilitation of Mashati Intake Structure
  15. Construction of Kwavameku Intake Structure
  16. Construction of 2 break pressure tanks
  17. Construction and installation of 24 air valve chambers
  18. Construction and installation of 26 washout chambers
  19. Construction and installation of 3 bulk water meter chambers

Client ................................ Kiliwater Company Ltd/Ministry of Water & Livestock Development, Tanzania
EKTM I 
Consulting Engineers............................ Gitec Consult/Service Plan Ltd.
Value of Works................ KShs. 76,549,555.00
Year of Completion.......... 2003
EKTM III 
Engineer............................ Poyry Environment GmbH.
Value of Works................ KShs. 119,176,200.70
Year of Completion.......... 2008



Water intake
 
Water intake
Rehabilitation of 3 intakes....


>> More Details


Construction and installation
 
Construction and installation
  1. Construction of 2 Break Pressur...


    >> More Details


Supply and installation Upvc Pipes
 
Supply and installation Upvc Pipes
  1. Supply and installation of 2,20...


    >> More Details


Rehabilitations of Reservoir
 
Rehabilitations of Reservoir
Rehabilitations of the Amboni Reservoir (4600m3)...


>> More Details


Bulk Meters
 
Bulk Meters
Installation of 8 bulk meters...


>> More Details

 
   
 
Home | About us | References | Plant & Machinery| All Projects | Contact us | Staff Mail
All Rights Reserved © 2010. Accident and Risk Prevention Policy